You are looking at a read-only demo. Everything here is fictional and the AI is simulated. You can read every page and ask the assistant questions, but nothing can be changed.Sign in with an access code to try the full workflow →
Controls and validation

Company controls, mapped to the regulations they satisfy.

Every assessment is graded against the company's own controls, and every control is tied to the regulations it exists to meet. Where a regulation has no control, that is shown as a gap, not hidden.

2 regulations have no company control mapped: EU GMP Annex 22 Artificial Intelligence (draft); EU GMP Annex 16 Certification by a Qualified Person and Batch Release.

Regulation coverage

Regulation or guidelineCompany controls that satisfy itLive assessmentsNeed a person
ICH Q9(R1) Quality Risk Management
ICH
65
ICH Q10 Pharmaceutical Quality System
ICH
42
ICH Q1A(R2) Stability Testing
ICH
10
21 CFR Part 211 Current Good Manufacturing Practice
FDA
82
21 CFR Part 11 Electronic Records and Signatures
FDA
11
EU GMP Chapter 1 Pharmaceutical Quality System
EMA / EC
32
EU GMP Chapter 2 Personnel
EMA / EC
20
EU GMP Chapter 4 Documentation
EMA / EC
21
EU GMP Chapter 5 Production
EMA / EC
11
EU GMP Chapter 6 Quality Control
EMA / EC
10
EU GMP Chapter 7 Outsourced Activities and Suppliers
EMA / EC
11
EU GMP Annex 1 Sterile Medicinal Products
EMA / EC
21
EU GMP Annex 11 Computerised Systems
EMA / EC
11
EU GMP Annex 15 Qualification and Validation
EMA / EC
11
EU GDP Chapter 9 Transportation
EMA / EC
22
EU GMP Annex 22 Artificial Intelligence (draft)
EMA / EC
Gap: no control mapped00
EU GMP Annex 16 Certification by a Qualified Person and Batch Release
EMA / EC
Gap: no control mapped00

Qualification status: IQ, OQ and PQ

Equipment and systems are qualified in three stages: installation (IQ), operational (OQ) and performance (PQ). Where an assessment bears on a stage, it is linked, so a deviation found in the AI's review shows up against the equipment it affects.

Equipment or systemIQOQPQ
Autoclave A-12
Equipment · Manufacturing
Complete, deviation
Executed; one probe calibration certificate was out of date
ASM-0010 Needs review
Planned
Starts once the IQ deviation is dispositioned
Not started
After OQ
Purified water system PW-03
Utility · Manufacturing
Complete
Approved 2026-01
Complete
Approved 2026-03
Complete
Three-phase sampling
Filling line FL-01
Equipment · Manufacturing
Complete
Approved 2025-11
Complete
Approved 2026-02
In progress
Fill-weight trend under watch
Cold storage room 3
Equipment · Distribution
Complete
Approved 2025-06
Complete
Approved 2025-08
Complete
Temperature excursion under review
ASM-0001 Needs review
Chromatography data system CDS-02
Computerised system · Quality System
Complete
Approved 2026-04
In progress
Audit-trail and access-control tests running
Not started
After OQ