You are looking at a read-only demo. Everything here is fictional and the AI is simulated. You can read every page and ask the assistant questions, but nothing can be changed.Sign in with an access code to try the full workflow →
← Document library
VMP-001Version 2.0Effective 2026-01-05Owner: ValidationEffective

Validation Master Plan

Fictional document for the demonstration.

§5.1 Qualification stages

Equipment and systems are qualified in three stages: installation qualification (IQ), operational qualification (OQ) and performance qualification (PQ). Each stage is approved before the next begins.

§5.2 Installation qualification

IQ confirms the equipment is installed to specification. All critical instruments used during IQ must hold in-date calibration certificates; an out-of-date certificate is recorded as a deviation and assessed for impact on the qualification.

§5.4 Performance qualification

PQ demonstrates consistent performance under routine conditions, typically across three consecutive phases, with all results within acceptance limits.